A mobile ice plant of 10 tons/day was successfully erected in Mali. This ice plant adopted our exclusive direct evaporation refrigeration system to produce solid ice blocks. In comparing to the traditional brine refrigeration technology, the direct evaporation technology has an overwhelming advantage of fast ice production and harvest time.
Years of Excellence
Covered Countries
Successful Projects
Served Clients
Arrive at destination location, ready for installment.
Discharge at the destination port.
Complete the installation and commissioning. Project fulfilled.
Shipping date.
Complete the fabrication process.
Prepare for trial run testing.
Pass the trial run testing. Ready for shipping.
Launch the fabrication process.